| 岩棉板是如何施工的 |
| 添加时间:2019/6/25 16:35:05 浏览次数: |
| 岩棉板是如何施工的 How to construct rock wool board 1、基层墙面处理:对于墙面上的污物、松软空鼓的抹灰层及油渍等,均应彻底铲除干净,对破损的抹灰层必须修补整平。长有苔藓的旧墙面,要用杀虫剂彻底清洗。新建建筑外墙抹灰应符合规范要求。 1. Base-level wall treatment: For the dirt on the wall, soft and empty plastering layer and oil stains, should be completely eradicated, the damaged plastering layer must be repaired and leveled. Old mossy walls should be thoroughly cleaned with pesticides. The plastering of exterior walls of new buildings should meet the requirements of the code. 2、涂刷界面砂浆:用滚刷或扫帚将界面砂浆均匀涂刷或机械喷涂。不得漏刷,拉毛不宜太厚。 2. Brushing interface mortar: The interface mortar is evenly brushed or mechanically sprayed by rolling brush or broom. Don't miss brushing, and don't pull too thick. 3、聚合物粘结砂配制:粘结砂浆:水=4.5:1(重www.a-bwm.com/news/html/?459.html量比)的比例加入水(参考比例)使用电动搅拌器充分交办均匀,静置5-10分钟,再次搅拌即可使用,搅拌好的砂浆在2小时内用完,严禁将已凝固的砂浆二次搅拌再投入使用。 3. Preparation of polymer bonded mortar: water = 4.5:1 (weight www.a-bwm.com/news/html/? 459.html ratio) proportion added water (reference ratio) using electric mixer fully handed over uniformly, stationary for 5-10 minutes, then stirring again, the stirred mortar can be used up in 2 hours, strictly prohibiting the second stirring of solidified mortar and then put into use. 4、根据图纸复核尺寸、墙面放线:在侧墙、顶板处根据保温装饰板厚度吊垂直、套方、弹厚度控制线,并在墙面上弹保温装饰板安装控制线。 4. Check size and wall layout according to drawings: hang vertical, square and elastic thickness control lines at side wall and roof according to thickness of thermal insulation decorative board, and install control lines on wall surface with elastic insulation decorative board. 5、粘贴一体板:板背涂抹粘结砂浆面积≥40%板背面积,涂好粘结砂浆的板应立即平粘到基层墙体,并在墙面上滑动就位,操作时应做到轻柔、均匀地挤压,以保证粘贴到墙面的装饰板表面平整度达到要求,并随时用一根2.0m的靠尺进行整平度校正。约24小时,等砂浆硬化后,打“十”和“一”字型锚固件。 5. Paste one-piece board: the area of bonded mortar on the back of the board is more than 40% of the area of the back of the board. The board coated with bonded mortar should be immediately flat-bonded to the basement wall and sliding in place on the wall. When operating, it should be squeezed gently and evenly to ensure that the surface smoothness of the decorative board pasted to the wall meets the requirements, and the flatness is corrected with a 2.0m footage at any time. About 24 hours, after the mortar hardens, the "ten" and "one" type anchorage pieces are struck. 6、密封胶或勾缝腻子勾缝:嵌缝时先用保温材料填缝,再用建筑耐候密封胶或嵌缝腻子勾缝,建筑耐候密封胶或嵌缝腻子最薄处不应小于3㎜厚,胶缝应勾成饱满、密实、连续、均匀、无气泡的凹形沟槽。 6. Sealant or sealant putty seam: Sealant or sealant putty seam should be filled with insulation material first, then sealant or sealant putty seam. The thinnest part of sealant or sealant putty should not be less than 3 inches thick. Sealant seam should be formed into a full, compact, continuous, uniform, non-bubble groove. 7、去保护膜、清洁表面:密封胶后勾缝腻子干燥后掀掉保护膜,对板面进行清洗,并谨防划伤板面。 7. Remove the protective film and clean the surface: After the sealant is dried, the slit putty is removed and the protective film is cleaned, and the surface of the board is carefully scratched. 8、验收:去保护膜、清洁表面后,检查版面平整、垂直和阴阳角方正。对不符合要求的及时更换。 8. Acceptance and acceptance: After removing the protective film and cleaning the surface, check that the layout is flat, vertical and the Yin-Yang angle is square. Timely replacement of non-conforming requirements. |
| 上一页 外墙保温岩棉板为外墙保温专用岩棉板 |
| 下一页 岩棉外墙外保温系统 |